Validated HVAC Performance Impact through Rigorous Measurement & Verification
CryogenX4 results are measured, not assumed. Field tests follow the International Performance Measurement and Verification Protocol (IPMVP): industry-standard sensors log indoor and outdoor temperature, humidity, chilled-water or air flow and energy use, typically every minute, over a testing period of usually 3 to 9 months.
A baseline is recorded before treatment, then the same data is collected after treatment. Only data points taken under like conditions (similar outdoor weather and similar building heat loads) are compared, so the measured difference reflects the treatment rather than the weather. Learn how to plan a test in our proof and verification guides.